Al Merjal is  the first Iraqi company completion for full Rehabilitation for Thermal Power Plant

Rehabilitation Of 2 Units Of 220 Mw Each, For Baiji Thermal Power As Subcontractor For ANSALDO Energy, Italy, In 1999 To 2000 . Work Includes Boilers, Turbines, Generators, And B.O.P.  Mechanical, Electrical, I&C , Inspection, Pre Commissioning & Commissioning.

Al Merjal is the first Iraqi company completion for full construction gas turbine plant; Complete Construction Of two Unit 265 MW (V.94.3) & 60 MW (V.64) Gas Turbine For TAZA Power Plant, 2004-2005, with SEIMENS as turnkey job ,Starting From Site preparation , Foundation, Steel Structures, GT, Air Intake, Auxiliary, Balance Of Plant, Piping And Fitting, Buildings, Gas Reduction Station, Water Treatment Unit, Fire Fighting Network , Control. Switch.

Untitled.png
Untitled.png
Vanguard-Citgo-2019-46.jpg

Rehabilitation of Unit 1,2,3,4 and 6 capacity 220 MW each, for Baiji Thermal Power Plant with Bechtel Co.,in 2004 to 2005 . Work includes boilers, turbines , generators, and B.O.P. Mechanical , electrical , I&C , Inspection, Pre commissioning & commissioning.

Rehabilitation of 2 boilers (580 Ton/Hr.) for units 5&6 including mechanical , electrical , I & C inspection , pre commissioning and commissioning with BABCOCK Co. , project started 2002, and finished in 2003.

Construction unit (3 &4 ) Baiji Gas Turbines (V.94.2) 159 MW each, with Odabrecht Co. 2005-2006. Complete Construction Of two Unit 159 MW (V.94.2) Gas Turbine For beiji Power Plant, as turnkey job ,Starting From Site preparation , Foundation, Steel Structures, GT, Air Intake, Auxiliary, Balance Of Plant, Piping And Fitting, Water Treatment Unit, Fire Fighting Network , Control. Switch Gear And I&C

Engineering , Supply & Construction of new, 150 ton/ hr, Bono Made for Daura oil refinery, ministry of oil .The scope of work included foundation, steel structure, and boiler installation. Pre-commissioning and commissioning, start up test for 72 hours, and over to client.

Installation of 2 fuel CU.M storage tanks for baiji plant includes foundation civil works

Complete Civil construction for Erbil gas power plant, 6X 125MW for ABB and private investor in Erbil city.

Completed in 2009

Installation of complete fire fighting network for Seeneya Refinery 20,000 brl/day/North Refinery Co. NRC, 2005.

Work included Piping, Feed Pump, Electronics including Alarm and Detection Instrumentation, Wiring, Control Panels.

LIST OF ALL PAST PROJECTS

Rehabilitation of unit 3 turbine and generator in MUSSAIB thermal power plant

Siemens - 2018-2019

Assessment and logistic services for AL-MUSSAIB TPS with GE preparing for rehabilitation of units 1,2 & 4.

General Electric Service Global - 2016-2017

Construction work for HFO deseil power plant with capacity of 4x6 MW

Wartsila - 2015

Rehabilitation of chemical
separation tower type O6 H1B

Aradat - 2014

EPC steam boiler 150 ton/hr of Bono made for DURA Refinery

BONO ENERGIA - 2010-2013

Full replacement service work of circulating
water system of water intake , baiji TPS

The Iraqi Ministry of Electricity - 2011

Full replacement works of two lifting pumps
station with capacity of 33000 m3 /hr

The Iraqi Ministry of Electricity - 2010

Condenser Re-tubing Services of Thermal

Units no. 1 to 6 Baiji Thermal Power Plant

The Iraqi Ministry of Electricity - 2008-2009

Complete civi l Construction services of Erbil gas turbine power plant with capacity of (6 X 125MW )

ABB 2007-2008

Full site technical assessment
services of uni t 1 & 3 Hi tachi Boilers for JICA –Al- Mussaib Power Plant

HITACHI - 2007-2008

Erection and construction of one new boiler of 150 ton/hr of bono enerigia made in DURAH REFINERY

Bono Energia - 2005-2006

EPC firefighting system in Seneya Refinery

The Iraqi Ministry of Oil - 2006

Complete erection and construction of two units of SIEMENS made SGT4000 and SGT800 and of 265 MW and 65 MW respectively, including all civil and electro-mechanical works

Siemens Westinghouse - 2004-2005

Rehabilitation of 5 thermal units no. 1,2,3, 4 & 6 ( 220 M W capacity each) Baiji Thermal Power Plant

Bechtel company 2004-2006

Full Contraction of 8 gas turbine units manufactured by GE 25 M W capacity

Washington Group
(GE Supervision) 2004-2005

Installation of 2 L FO storage tanks 5000 m3 capacity BAIJI GPS.

The Iraqi Ministry of Electricity 2003-2004

Rehabilitation of unit 5 & 6 boilers 580 Ton/Hr. capacity each as well as allrelated auxiliary work Dora TPS

Babcock 2002-2004

A complete installation facility of 2 gas
turbine units no. 3 & 4 manufactured by
Siemens 159 MW capacity type V.94.2

ODEBRECHT Company
(Siemens Supervision) - 2004-2005

Dismantling of one complete Boiler 90
Ton/Hr. capacity and install new Boiler
capacity 160 Ton/Hr., Dora Refinery

The Iraqi Ministry of Oil - 2002-2003

Rehabilitation of 6 Boilers capacity 80 Ton/
Hr. Al-Phosphate chemical plant facility in
Al – Anbar Gov.

The Iraqi Ministry of Industry - 2001-2003

Rehabilitation of steam boiler with capacity of 80 Ton /Hr. Al-Phosphate chemical plant facility in Al – Anbar Gov 

The Iraqi Ministry of Industry - 2000

Rehabilitation of 2 thermal power units 220MW capacity each

Ansaldo Energia - 1996-1998

Full replacement work services of water tube boiler and furnace as well for steam
boiler no. 1 to 4 Baji thermal power plant

The Iraqi Ministry of Electricity - 1996-1998